Sorry, this entry is only available in 日本語.
B011 Project for Establishment of the Meteorological Radar System in Dhaka and Rangpur in the People’s Republic of Bangladesh (2020 – 2025 scheduled)
Client: Bangladesh Meteorological Department (BMD)
Major Components:
- Construction of Meteorological Radar Tower Buildings at Dhaka and Rangpur (Height: approx. 47m)
- S-Band Doppler Pulse Compression Solid State Radar Systems
- Meteorological Data Satellite Communication System (VSAT)


A010 Preparatory Survey on Project for Establishment of the Meteorological Radar System in Dhaka and Rangpur in the People’s Republic of Bangladesh (2014 – 2015)
Client: Japan International Cooperation Agency (JICA)
Survey Items:
- Construction of Meteorological Radar Tower Buildings at Dhaka and Rangpur
- S-Band Doppler Pulse Compression Solid State Radar Systems
- Meteorological Data Satellite Communication Systems (VSAT)
C003 Technical Cooperation Project for Development of Human Capacity on Operation of Weather Analysis and Forecasting in the People’s Republic of Bangladesh (2009 – 2014)
Client: Japan International Cooperation Agency (JICA)
Counterpart: Bangladesh Meteorological Department (BMD)
Major Activities:
- Training for field observers based on the field observation guidelines and the data entry format
- Training on the data quality of observed data for forecasters
- Preparation of the operation and maintenance manuals for observation fields and instruments (including AWS)
- Training for field observers and instruments inspectors on the maintenance of observation fields and observation instruments (including AWS)
- Preparation and conduct of the briefing flowchart and record
- Identification of the radar ZR relation parameter for rainfall calculation in the observation range of 5 existing meteorological radar systems and optimization of the parameters
- Preparation of correlation charts for rainfall data of radar and surface observations
- Optimization of radar ZR relation parameters for rainfall calculation
- Development of daily observation data input sheet for easy statistical processing and data quality control of observation data
- Training on Numerical Weather Prediction (Meso Scale Model) by using PC (Linux) on trial basis and forecast guidance
- Preparation of the operation and maintenance manuals for the meteorological radar system
- Training on the operation and maintenance of meteorological radar systems
- Preparation of the meteorological radar observation routine schedule


B002 Project for Establishment of the Meteorological Radar System at Moulvibazar in the People’s Republic of Bangladesh (2007 – 2009)
Client: Bangladesh Meteorological Department (BMD)
Major Components:
- Construction of a Meteorological Radar Tower Building at Moulvibazar (Height: approx. 47m)
- S-Band Doppler Radar System
- Meteorological Data Satellite Communication System (VSAT)

B001 Project for Improvement of the Meteorological Radar System at Cox’s Bazar and Khepupara in the People’s Republic of Bangladesh, Phase-I and Phase-II (2006 – 2008)
Client: Bangladesh Meteorological Department (BMD)
Major Components:
- Construction of Meteorological Radar Tower Buildings at Cox’s Bazar and Khepupara (Height of Cox’s Bazar tower: approx. 24m; and, Khepupara tower: approx. 33m)
- S-Band Doppler Radar Systems
- Radar Composite Imagery System at the Dhaka Head Office
- Meteorological Satellite Data Receiving System and Meteorological Data Satellite Communication Systems (VSAT)

